Green Point Design
Member Australian Institute of Architects

FEES BASED ON AREA

It is possible to calculate architectural fees  using building AREA rather than building COSTS for projects requiring Service Package A. For Service Packages B and C, the standard Fee Schedule based on building cost is a more reliable guide.

This can suit circumstances like owner building, insurance claims or where it is useful to anticipate architectural fees at the beginning of a project.

Please click HERE to download (1.1Mb) a description, fee table and a two step worked example.

The fees based on area are similar to fees based on building costs.  As the building area increases, the fee increases; however, the fee per square meter decreases. As a project grows in size, there is usually some repetition and an economy on time.

 

 

© Copyright Green Point Design 2010. All rights reserved.

website by Small Dog